Scope
This project consisted of demolition of the existing space as well as adding new concrete fill in, new fire proof stair railings, structural steel columns, door jams, and roof beams. In addition, waterproofing was furnished throughout the facility. Several glass and aluminum window assembly doors with clear anodized aluminum frames and bulletproof polycarbonate, aluminum and scratch resistant window assemblies were installed as well. RBA installed intercom stations and amplifiers for better communication throughout the firing range. RBA completed the project with upgrading the electrical and a newly designed fire sprinkler system.