Scope
For this project, RBA Builders completely stripped a two story sports zone building in order to create a behind the scenes backdrop and store front for a new pop up attraction. RBA removed and stripped all of the existing features of both the exterior and interior of the building. RBA installed curtains that extended from the ceiling of the second floor to the bottom of the first, confetti vinyl tile, signage, steel framing for the outside of the building, as well as completing a large amount of themed painting for the client.