RBA Builders > Projects > Public Works > UCI HEALTH – B478 7th FLOOR T.I.
UCI Health

UCI HEALTH – B478 7th FLOOR T.I.

Orange, CA

Project General Description

Client Name: UCI Health

Location: Orange, CA

Square Footage: 17,500

Project Type: Tenant Improvement

Project Completion Period: August 2021 - December 2021

Architect: Gills + Panichapan Architects, Inc.

Electrical Engineer: H2S Engineers, Inc.

Mechanical Engineer: H2S Engineers, Inc.

Scope
RBA was hired for the UCI Health 7th Floor Tenant Improvement Project, which involved the entire 7th floor (17,500 SF) of UCI Health offices. The project included a 40-seat shared conference room and break room. These were designed to serve the four departments occupying the floor. The renovation also included 45 private offices, modular workstations, and six smaller conference rooms. These spaces were created to facilitate collaboration between departments. A large break room was added for the entire floor. The UCI Health 7th Floor Tenant Improvement Project also included work on wall construction, electrical and plumbing installation, and HVAC upgrades as well as low-voltage wiring, casework, cabling, finishes, and furniture installation.

 

Orange, CA

UCI HEALTH – B478 7th FLOOR T.I.

Public Works Sector- UCI HEALTH – B478 7th FLOOR T.I.- A tenant improvement to the whole 7th floor (17,500 SF) of the UCI office building.

Other healthcare Projects